VANCOUVER, BC, January 18, 2011, Mirasol Resources Ltd. (TSX-V: MRZ, Frankfurt: M8R) is pleased to announce the results from an infill drilling at the La Negra silver-gold deposit at the Joaquin Project in Santa Cruz, Argentina and to present a new geological model for the La Negra deposit being explored by Mirasol’s joint venture partner Coeur d’Alene Mines (“Coeur”).

Infill drilling at La Negra was conducted on 50 metre spaced sections with approximately 50 metre spaced drill centers. This press release presents a summary of the infill drilling results (Table 1), with complete results available on Mirasol’s website.

Better intersections from the infill drilling include DDJ-115 with 67.0 metres of 94 g/t AgEQ (silver equivalent), DDJ-117 with 15.0 metres of 972 g/t AgEQ, and DDJ-132 with 13.6 metres of 1,454 AgEQ. These intersections correspond to what has been modeled (Figure 1 and Figure 2) as feeder zone and “manto” style mineralization proximal to the feeder. Additional indicative intersections from within the mantos include DDJ-123 of 61.85m with of 82 g/t AgEQ, and DDJ-124 containing 58.3 metres of 65 g/t AgEQ. The overall grade and thickness of the intercepts from the infill program appears similar to that of the previous drill holes.

Modeling of the La Negra silver mineralization by Coeur suggests the possibility of a central, sub-vertical, structurally-controlled feeder zone with a series of stacked sub-horizontal “mantos” possibly controlled by lithologic contacts adjacent to the feeder structure. The plan projection of the mantos to surface is up to 800 metres wide, while the strike length of the feeder zone has been drilled over 1,000 metres. This new model, if proven to be correct by further drilling, may have significant positive implications for the volume of mineralization present.

The modeling also shows that although the depth of oxidation is variable, the majority of the La Negra deposit is oxidized to between 200 and 250 metres below surface. This deep oxidation suggests potential for development of the oxide material via a bulk mining leach operation.

Coeur is actively undertaking surface exploration at Joaquin in Q1 of 2011 on the approximately 80% of the Joaquin claims that remain underexplored. Coeur has commissioned an independent study which has identified multiple priority targets for exploration follow up. This program is expected to include drill testing of previously untested targets.

In December 2010, Coeur, the Project operator, notified Mirasol that it has expended the necessary funds to earn a 51% interest in Joaquin. Coeur may elect to increase its interest to 61% by funding a 43-101 compliant feasibility study on Joaquin, and upon completion, may acquire a further 10% to reach 71% interest if project financing is provided at the request of Mirasol. The Joaquin project is located in the Area of Special Interest for Mining in Santa Cruz, Argentina where four precious metal mines are currently operating.

Table 1. Joaquin Project — Selected La Negra Infill Drill Results

Drill Hole

Intercept

From
(metres)

To 
(metres)

Intercept
length
(metres)

Core
Recv. (%)

Silver
(g/t)

Gold
(g/t)

AgEQ
(g/t)

AgEQ gram
metre
product

DDJ-115

2nd

63.1

105.0

41.9

90

66

0.03

68


2,012

including

 

79.5

79.9

0.4

85

2,090

1.87

2,212

 626

DDJ-115

5th

213.5

280.5

67.0

88

88

0.09

94


4,466

including

 

256.0

259.4

3.4

62

564

1.39

654


1,572

DDJ-117

1st

57.0

81.7

24.7

100

38

0.02

39


677

DDJ-117

2nd

207.0

228.5

21.5

92

24

0.03

26


397

DDJ-117

3rd

240.5

246.5

6.0

94

35

0.00

35


150

DDJ-117

4th

272.5

287.5

15.0

98

537

6.70

972

 10,311

including

 

274.0

275.5

1.5

93

4,980

66.80

9,322


9,887

DDJ-119

 

33.0

84.5

51.5

94

160

0.31

181


6,581

including

 

47.0

53.0

6.0

99

465

0.47

495


2,102

DDJ-121

1st

22.5

61.4

38.9

97

32

0.01

33


901

DDJ-121

2nd

82.5

163.7

81.2

95

61

0.14

70


4,018

including

 

113.5

130.4

16.9

97

144

0.25

160


1,912

DDJ-123

1st

30.3

92.2

61.9

96

74

0.11

82


3,567

including

 

85.2

90.9

5.7

98

487

0.53

522


2,102

DDJ-124

1st

48.9

107.2

58.3

84

64

0.01

65


2,674

including

 

94.7

100.2

5.6

96

232

0.00

232


912

DDJ-124

4th

245.1

274.5

29.4

77

80

0.47

110


2,291

including

 

249.8

268.5

18.7

72

106

0.67

149


1,972

DDJ-125

 

52.0

102.0

50.0

97

39

0.24

55


1,937

DDJ-126

1st

46.5

53.8

7.3

100

425

0.03

427


2,194

including

 

46.5

48.0

1.5

100

1,810

0.00

1,810


1,920

DDJ-126

2nd

77.3

102.0

24.7

95

76

0.06

81


1,408

including

 

94.7

95.5

0.8

100

732

0.45

761


431

DDJ-126

3rd

112.0

182.5

70.5

94

28

0.07

32


1,602

DDJ-132

1st

59.9

73.5

13.6

96

1,443

0.16

1,454

 13,961

including

 

62.4

67.4

5.0

95

3,731

0.31

3,751

 13,263

  • Silver equivalent is calculated as AgEQ g/t = Ag g/t + 65 x Au g/t. Metallurgical recoveries are unknown and therefore assumed to be 100%.
  • Primary intersections are calculated at a cutoff grade of 20 g/t (La Negra) silver equivalent (AgEQ) and 30 g/t (La Morocha) with some internal dilution allowed at the discretion of the project’s Qualified Person.
  • “Included” intersections are calculated at a 50 g/t or higher cutoff grade.
  • Reported grades are not capped.
  • Estimated true widths have not been calculated and the AgEq gram metre product is thus based on uncorrected core lengths of the intercepts

Mirasol’s management is pleased with the infill drilling results at the La Negra silver-gold deposit, which confirm the potential for bulk-mineable mineralization at economic grades. Mirasol Resources is pleased to be evaluating this project with Coeur d’Alene, who brings to the joint venture significant experience in the exploration and development of epithermal precious metal mineralization in the region.

Paul G. Lhotka, Principal Geologist for Mirasol, is the Qualified Person under NI 43-101 who has approved the technical content of this news release.

For further information, contact:
Mary L. Little
President and CEO

Tel:(604) 602-9989: Fax:(604) 609-9946

Email: contact@mirasolresources.com
Website: www.mirasolresources.com

Quality Assurance/Quality Control:
Coeur d’Alene operates the Joaquin Joint Venture and generated the drilling data used in this news release and reported it to Mirasol. Drill core samples were submitted to Alex Stewart (Assayers), Argentina S.A. and ALS Laboratories, both ISO 9000-2000 accredited laboratories located in Mendoza, Argentina. Gold and silver results were determined using standard fire assay techniques on a 50 gram sample with an atomic absorption finish for gold and a gravimetric finish for silver. Coeur’s QAQC program includes the insertion of blanks, standards and duplicates into the sample stream for Joaquin drill holes. Mirasol has performed an independent analysis of the QAQC data generated by Coeur. Dr. Paul Lhotka has reviewed the Coeur data, calculated the intercepts in this news release, and is a qualified person as defined by National Instrument 43-101.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Filter News

Mirasol Exploration
Active Partnership
Available for Partnership
Company

Subscribe for Updates

You are about to leave the Mirasol Resources Website

You are about to leave the Mirasol website and will be redirected to SEDAR.com. If you would like to continue, click OK below

www.sedar.com is the official site that provides access to most public securities documents and information filed by issuers with the thirteen provincial and territorial securities regulatory authorities (“Canadian Securities Administrators” or “CSA”) in the SEDAR filing system

OK, I understand and wish to proceed to SEDAR.com